Skip to content

WBIR: Students tour inside of bridge on ‘Missing Link’

Foothills Parkway is opening November 9 and the bridge is made up of 92 concrete tunnels. UT engineering students were given the opportunity to tour the hollow bridge of the Missing Link on the Foothills Parkway before the roadway opens to the public.

Read more about the tour and the new bridge. 

The flagship campus of the University of Tennessee System and partner in the Tennessee Transfer Pathway.

View our Privacy Policy.